The Project

    Our client for this project was the UK Headquarters of German Green building service specialist Steibel Elton, based just down the road from our head office in Bromborough. Stiebel Eltron had recently occupied the adjoining office and warehouse to their existing unit, so they hired us to amalgamate the two properties. The merger required us to design and install a new stairway and hall, refurbish and fit out two canteens, several offices, conference rooms, training rooms and welfare facilities and then knock through between the two warehouses to create an extra large storage space on the ground floor.

    Challenges & Solutions

    From the beginning, we were aware that the project couldn’t hold up daily operations at Stiebel, which stayed open and fully functioning throughout the office and warehouse space. To ensure we minimised disruption, we developed our programme with the client so that access to welfare functions and kitchen space was always available and the most disruptive works were carried out at non-peak office times. As we always do, we kept our client up to speed with weekly progress updates, which allowed for a stress-free relocation when it was time to move staff from the old unit to the newly refurbished office suite.
    One of the trickiest elements of this project was the demolition and temporary works preparing for the installation of a landing and stairwell area connecting units 1 and 2. To ensure that the project ran as smoothly as possible, in a safe and controlled manner, it was essential to coordinate with the nominated client sub-contractors involved in the works. We held daily meetings to programme phased works so that everyone involved fully understood what was required and when.

    Outcome

    The project was completed without incident and within budget. Overall the client was extremely pleased with our work as indicated by our recent feedback (included below.) Having completed the first refurbishment of Stiebel’s facility ten years ago it was a pleasure to be asked back in 2022 and we are confident that the strong working relationship that we have built will lead to more work should they need our services again in the future.

    “The whole team have worked incredibly well and have integrated themselves into my business and our team very well indeed. All Stiebel Eltron staff members know the Trustland team members by their first names and vice versa and they have established a real camaraderie which has made working through the typical disruption much easier to deal with. It will be a real shame to see the lads leave our site, but I am sure we will see them all again when we revamp the building in another 5 years!!! From the initial consultation with Dave and Neil through the construction phase with Jules and his team and now to the finished result, the project has gone swimmingly well and the aesthetics of the building stand testimony to the work that has been carried out by the Trustland team.”

    Mark McManus

    Stiebel Eltron UK, Managing Director

    Could we help you with a similar project?

    Get in touch.

    0151 653 5566

    info@trustland.co.uk